WP 5 Objectives
fransed logo
MENU
WP5 objectives
Main Objectives :
The main objective of WP 5 is to test new Francis turbine design in a power plant.
Secondary Objectives :
- Find a prototype test sites in India and in Nepal
- Mechanical design of the prototype
- Production of the prototype
- Performance testing of the turbines
Wp5 objective picture
Bhilangana Power Plant. Photo : Ole Gunnar Dahlhaug