Navigation

  • Skip to Content
NTNU Home

HydroCen

  • HydroCen
  • Research
    • Hydropower structures
    • Turbine and generators
    • Market and services
    • Environmental design
    • Interdisciplinary projects
    • Laboratories
    • Associated projects
    • HydroCen Laboratories
  • Publications
  • News blog
  • Contact
  • About HydroCen
    • About HydroCen
    • Organisation
    • Partners
    • Board
    • Scientific Committee
    • Strategy and goals
  • International
    • International collaboration
    • Cross Atlantic Hydropower Research Alliance
    • DigiSur
    • EERA JP Hydropower
    • FishPath
    • FIThydro
    • Francis99
    • FranSed
    • HydroFlex
    • Hydro-Himalaya
  • Login Sharepoint
  1. HydroCen International FranSed Work Packages
  2. WP 5
  3. Task 5.3 Production of prototype

Språkvelger

Task 5.3 Production of prototype

×
  • International collaboration
  • Cross Atlantic Hydropower Research Alliance
  • DigiSur
  • EERA JP Hydropower
  • FishPath
  • FIThydro
  • Francis99
  • FranSed
    • About
    • Work Packages
      • WP 1
      • WP 2
      • WP 3
      • WP 4
      • WP 5
        • WP 5 Objectives
        • Task 5.1 Find Prototype test sites
        • Task 5.2 Mechanical design of prototype
        • Task 5.3 Production of prototype
        • Task 5.4 Performance testing
      • WP 6
    • News and Publications
    • FranSed Project Team
    • Contact
  • HydroFlex
  • Hydro-Himalaya

fransed logo

    FranSed logo. Logo.

MENU

Task 5.3

Task 5.3 : Production of the prototype

The major objective of this project activity is production of the prototype.

The turbine designed from WP 5.2 will be prepared for manufacturing. The manufacturing drawing of the turbine will be reviewed and finalized for production. The production companies will be approached and discussion programs will be held. After finalizing the funding source, the turbines will be given for manufacturing. The number of turbines to be manufactured depends on the available funding. However, it is expected that at least one turbine each from India and Nepal will be produced.

Deliverables 5.3

  • Deliverables

D5.5   Finalize the manufacturer for production of turbines     - M38

D5.6   Production of the prototype turbine     - M45

 

  • Milestones

MS5.3   Procurement of the prototype turbines     - M45

NTNU – Norwegian University of Science and Technology

  • For employees
  • |
  • For students
  • |
  • Intranet
  • |
  • Blackboard

Studies

  • Master's programmes in English
  • For exchange students
  • PhD opportunities
  • Courses
  • Career development
  • Continuing education
  • Application process

News

  • NTNU News
  • Vacancies

About NTNU

  • About the university
  • Libraries
  • NTNU's strategy
  • Research excellence
  • Strategic research areas
  • Organizational chart

Contact

  • Contact NTNU
  • Employees
  • Find experts
  • Press contacts
  • Researcher support
  • Maps

NTNU in three cities

  • NTNU in Gjøvik
  • NTNU in Trondheim
  • NTNU in Ålesund

About this website

  • Use of cookies
  • Accessibility statement
  • Privacy policy
  • Editorial responsibility
Sign In
NTNU logo