WP 4 Objectives
fransed logo
MENU
WP4 objectives
Main objectives :
The major objective of WP4 is to carry out turbine performance tests in the laboratory.
Secondary objectives :
- Develop a mechanical design for the model turbine
- Produce and install the model turbine in the laboratory
- Install instrumentation that meet the requirement of IEC 60193
- Carry out model tests
WP4
Chilime Powerplant, Nepal. Photo : Ole Gunnar Dahlhaug