Task 4.3
Task 4.3 : Install instrumentation that meet the requirement of IEC 60193
The major objective of this project activity is to install IEC60193 standard instrumentation.
Most activities of this objective will run in parallel to WP 4.2. The instrumentations needed for testing the model turbines will be planned, procured and installed. The targeted region, or the location of the sensors will be different compared to the ones purchased in EnergizeNepal project.
Deliverables 4.3
- Deliverables
D4.5 Model turbine ready for testing with instruments - M29
- Milestones
MS4.3 TTL ready for IEC 60193 standard test - M30