The major objective of this project activity is to carry out model tests based on IEC standards.
This activity is related to testing and analyzing results. At first, a preliminary testing will be carried out with the installed turbines and sensors. Then, the testing procedures and analysis sequence will be prepared to conduct the lab testing according to IEC60193. The final work of this WP is to publish papers based on the results obtained from the testing. The first model testing will be carried out on the first design proposed by NTNU (through WP 2.1). The second model testing will be carried out in IIT-R for the optimized design proposed by IIT-R erosion model and NTNU design modification (through WP 2 and WP 3).
TTL
Turbine Testing Lab at KU (from inside).
Deliverables 4.4
- Deliverables
D4.6 A complete IEC testing report from KU - M41
D4.7 IEC testing report from IIT-R - M48
- Milestones
MS4.4 Journal papers from the results obtained - M42