Navigation

  • Skip to Content
NTNU Home

HydroCen

  • HydroCen
  • Research
    • Hydropower structures
    • Turbine and generators
    • Market and services
    • Environmental design
    • Interdisciplinary projects
    • Laboratories
    • Associated projects
    • HydroCen Laboratories
  • Publications
  • News blog
  • Contact
  • About HydroCen
    • About HydroCen
    • Organisation
    • Partners
    • Board
    • Scientific Committee
    • Strategy and goals
  • International
    • International collaboration
    • Cross Atlantic Hydropower Research Alliance
    • DigiSur
    • EERA JP Hydropower
    • FishPath
    • FIThydro
    • Francis99
    • FranSed
    • HydroFlex
    • Hydro-Himalaya
  • Login Sharepoint
  1. HydroCen International FranSed Work Packages
  2. WP 4
  3. Task 4.4 Carry out model tests

Språkvelger

Task 4.4 Carry out model tests

×
  • International collaboration
  • Cross Atlantic Hydropower Research Alliance
  • DigiSur
  • EERA JP Hydropower
  • FishPath
  • FIThydro
  • Francis99
  • FranSed
    • About
    • Work Packages
      • WP 1
      • WP 2
      • WP 3
      • WP 4
        • WP 4 Objectives
        • Task 4.1 Mechanical design
        • Task 4.2 Produce and install model turbine in laboratory
        • Task 4.3 Install instrumentation
        • Task 4.4 Carry out model tests
      • WP 5
      • WP 6
    • News and Publications
    • FranSed Project Team
    • Contact
  • HydroFlex
  • Hydro-Himalaya

fransed logo

    FranSed logo. Logo.

MENU

Task 4.4

Task 4.4 : Carry out model tests

The major objective of this project activity is to carry out model tests based on IEC standards.

This activity is related to testing and analyzing results. At first, a preliminary testing will be carried out with the installed turbines and sensors. Then, the testing procedures and analysis sequence will be prepared to conduct the lab testing according to IEC60193. The final work of this WP is to publish papers based on the results obtained from the testing. The first model testing will be carried out on the first design proposed by NTNU (through WP 2.1). The second model testing will be carried out in IIT-R for the optimized design proposed by IIT-R erosion model and NTNU design modification (through WP 2 and WP 3).

TTL

    Turbine Testing Lab at KU (from inside).

Deliverables 4.4

  • Deliverables

D4.6   A complete IEC testing report from KU      - M41

D4.7   IEC testing report from IIT-R              - M48

 

  • Milestones

MS4.4   Journal papers from the results obtained      - M42

NTNU – Norwegian University of Science and Technology

  • For employees
  • |
  • For students
  • |
  • Intranet
  • |
  • Blackboard

Studies

  • Master's programmes in English
  • For exchange students
  • PhD opportunities
  • Courses
  • Career development
  • Continuing education
  • Application process

News

  • NTNU News
  • Vacancies

About NTNU

  • About the university
  • Libraries
  • NTNU's strategy
  • Research excellence
  • Strategic research areas
  • Organizational chart

Contact

  • Contact NTNU
  • Employees
  • Find experts
  • Press contacts
  • Researcher support
  • Maps

NTNU in three cities

  • NTNU in Gjøvik
  • NTNU in Trondheim
  • NTNU in Ålesund

About this website

  • Use of cookies
  • Accessibility statement
  • Privacy policy
  • Editorial responsibility
Sign In
NTNU logo