Task 2.4 Francis Turbine design (second site)
fransed logo
MENY
Task 2.4
Task 2.4 Francis turbine design (Second site)
The major objective of this project activity is to develop a new hydraulic design of a Francis turbine for the second site.
This task will use the same design principle as WP 2.1 and focus on the second site which will be identified from WP 1.2 and WP 5. The idea is to disseminate the knowledge of the new design principles from NTNU to KU and IIT-R.
Deliverables 2.4
- Deliverables
D2.4 Report on the design of variable-speed Francis turbine runner with/without GV -M36
- Milestones
MS2.8 Design of the turbine for the second site -M36