Navigation

  • Skip to Content
NTNU Home

HydroCen

  • HydroCen
  • Research
    • Hydropower structures
    • Turbine and generators
    • Market and services
    • Environmental design
    • Interdisciplinary projects
    • Laboratories
    • Associated projects
    • HydroCen Laboratories
  • Publications
  • News blog
  • Contact
  • About HydroCen
    • About HydroCen
    • Organisation
    • Partners
    • Board
    • Scientific Committee
    • Strategy and goals
  • International
    • International collaboration
    • Cross Atlantic Hydropower Research Alliance
    • DigiSur
    • EERA JP Hydropower
    • FishPath
    • FIThydro
    • Francis99
    • FranSed
    • HydroFlex
    • Hydro-Himalaya
  • Login Sharepoint
  1. HydroCen International FranSed Work Packages
  2. WP 1
  3. Task 1.2 : Reference sites

Språkvelger

Task 1.2 : Reference sites

×
  • International collaboration
  • Cross Atlantic Hydropower Research Alliance
  • DigiSur
  • EERA JP Hydropower
  • FishPath
  • FIThydro
  • Francis99
  • FranSed
    • About
    • Work Packages
      • WP 1
        • WP 1 Objectives
        • Task 1.1 : Operation scenarios
        • Task 1.2 : Reference sites
        • Task 1.3 : Develop a guide
      • WP 2
      • WP 3
      • WP 4
      • WP 5
      • WP 6
    • News and Publications
    • FranSed Project Team
    • Contact
  • HydroFlex
  • Hydro-Himalaya

fransed logo

    FranSed logo. Logo.

MENU

Task 1.2

Task 1.2 :Reference sites 

The major objective of this project activity is to develop a guide which describes requirements of the HPPs for future projects.

This activity relates to preparing the guide book which consists of requirements of the power plants which are exposed to excessive sediments. The book will receive inputs from other work packages, for example, from the perspectives of the design of the turbines for better sediment handling.

forest kerr

forest river    Photo : Bibek Neupane

Deliverables 1.2

  • Deliverables

D1.3 Report of the detailed case study of two power plants (technical and financial)     - M18

D1.4 Letter of intent from the power plant owners or other agencies for the technical and financial support     - M24

  • Milestones

MS1.2 Finalize at least two power plants affected by sediments as the test cases and securing funds for prototype tests     - M25

NTNU – Norwegian University of Science and Technology

  • For employees
  • |
  • For students
  • |
  • Intranet
  • |
  • Blackboard

Studies

  • Master's programmes in English
  • For exchange students
  • PhD opportunities
  • Courses
  • Career development
  • Continuing education
  • Application process

News

  • NTNU News
  • Vacancies

About NTNU

  • About the university
  • Libraries
  • NTNU's strategy
  • Research excellence
  • Strategic research areas
  • Organizational chart

Contact

  • Contact NTNU
  • Employees
  • Find experts
  • Press contacts
  • Researcher support
  • Maps

NTNU in three cities

  • NTNU in Gjøvik
  • NTNU in Trondheim
  • NTNU in Ålesund

About this website

  • Use of cookies
  • Accessibility statement
  • Privacy policy
  • Editorial responsibility
Sign In
NTNU logo