Navigasjon

  • Hopp til innhold
NTNU Hjemmeside

HydroCen

  • HydroCen
  • Research
    • Hydropower structures
    • Turbine and generators
    • Market and services
    • Environmental design
    • Interdisciplinary projects
    • Laboratories
    • Associated projects
    • HydroCen Laboratories
  • Publications
  • News blog
  • Contact
  • About HydroCen
    • About HydroCen
    • Organisation
    • Partners
    • Board
    • Scientific Committee
    • Strategy and goals
  • International
    • International collaboration
    • Cross Atlantic Hydropower Research Alliance
    • DigiSur
    • EERA JP Hydropower
    • FishPath
    • FIThydro
    • Francis99
    • FranSed
    • HydroFlex
    • Hydro-Himalaya
  • Login Sharepoint
  1. HydroCen Research Turbine and generators
  2. 2.3 Pump turbines in existing power plants
  3. Reversible pumpturbines in existing power plants

Språkvelger

Reversible pumpturbines in existing power plants

×
  • Hydropower structures
  • Turbine and generators
    • 2.1 Variable speed operation
    • 2.2 Fatigue loads on turbines
    • 2.3 Pump turbines in existing power plants
      • Reversible pumpturbines in existing power plants
    • 2.4 Turbine and generator lifetime
    • 2.5 Flexible hydropower unit
    • 2.6 New Design of Guide Vanes
    • DigiSur
  • Market and services
  • Environmental design
  • Interdisciplinary projects
  • Laboratories
  • Associated projects
  • HydroCen Laboratories
MENY

Reversible pumpturbines in existing power plants

Reversible pumpturbines in existing power plants

Reversible pumpturbines in existing power plants

When reconstructing existing power plants into pumped storage plants, new turbine solutions are required when replacing the existing runner.Since a reversible pump-turbine (RPT) must be designed considerably larger to ensure a suffi cient pressure head, in addition to demand further immerse, there is a need of a simpler and more cost-effective alternative.

Objective
The aim of this PhD research is to examine if a booster pump installed in the draft tube can replace the need of increasing the runner dimensions and avoid the immersion requirement. The pressure contribution from the booster pump should feed the RPT suffi ciently and also ensure that no cavitation occurs in the inlet areas of the runner.

By using a contra-rotating axial pump as a booster, the rotation between the pump and runner can be controlled and manipulate the pump characteristics of the RPT. This could possibly change the necessity of designing the
RPT similar to a pump and avoid the runner from running in turbine mode outside best point.

The research work will consist of laboratory work, field measurements, cooperation with pump and turbine manufacturers, literature review and numerical simulations. By the end of the PhD work, a booster pump design should be completed and further be tested in Roskrepp power plant, Sira-Kvina.

Contact

Contact

Contact

Helene Njølstad Dagsvik

PhD

Email: helene.n.dagsvik@ntnu.no

Supervisor: Pål-Tore Selbo Storli

NTNU – Norges teknisk-naturvitenskapelige universitet

  • For ansatte
  • |
  • For studenter
  • |
  • Innsida
  • |
  • Blackboard

Studere

  • Om studier
  • Studieprogram
  • Emner
  • Videreutdanning
  • Karriere

Aktuelt

  • Nyheter
  • Arrangement
  • Jobbe ved NTNU

Om NTNU

  • Om NTNU
  • Bibliotek
  • Strategi
  • Forskning
  • Satsingsområder
  • Innovasjon
  • Organisasjonskart
  • Utdanningskvalitet

Kontakt

  • Kontakt oss
  • Finn ansatte
  • Spør en ekspert
  • Pressekontakter
  • Kart

NTNU i tre byer

  • NTNU i Gjøvik
  • NTNU i Trondheim
  • NTNU i Ålesund

Om nettstedet

  • Bruk av informasjonskapsler
  • Tilgjengelighetserklæring
  • Personvern
  • Ansvarlig redaktør
Logg inn
NTNU logo