Navigasjon

  • Hopp til innhold
NTNU Hjemmeside

HydroCen

  • HydroCen
  • Research
    • Hydropower structures
    • Turbine and generators
    • Market and services
    • Environmental design
    • Interdisciplinary projects
    • Laboratories
    • Associated projects
    • HydroCen Laboratories
  • Publications
  • News blog
  • Contact
  • About HydroCen
    • About HydroCen
    • Organisation
    • Partners
    • Board
    • Scientific Committee
    • Strategy and goals
  • International
    • International collaboration
    • Cross Atlantic Hydropower Research Alliance
    • DigiSur
    • EERA JP Hydropower
    • FishPath
    • FIThydro
    • Francis99
    • FranSed
    • HydroFlex
    • Hydro-Himalaya
  • Login Sharepoint
  1. HydroCen Research HydroCen Laboratories
  2. Work packages
  3. WP2: Hydraulic Laboratory

Språkvelger

WP2: Hydraulic Laboratory

×
  • Hydropower structures
  • Turbine and generators
  • Market and services
  • Environmental design
  • Interdisciplinary projects
  • Laboratories
  • Associated projects
  • HydroCen Laboratories
    • About the project
    • Consortium and board
    • Work packages
      • WP1: Waterpower Laboratory
      • WP2: Hydraulic Laboratory
      • WP3: Data Management
MENY

Hydraulic Laboratory

Hydraulic Laboratory

The objective for this work package is to develop a hydraulic laboratory with an infrastructure and instrumentation suited for the hydropower industry and to investigate and solve future societal water related challenges.'

Description of work:

This work package will coordinate the procurement, refurbishment and installation of new equipment in the Hydraulic Laboratory and the Geology facility.

Task 2.1    Planning and installation of flumes. NTNU (lead), NINA (advisor)

Task 2.2    Acquiring equipment for hydraulic measurement and model construction. NTNU (lead)

Task 2.3    New water circulation system in the Hydraulic Lab. NTNU (lead), NINA (advisor)

Task 2.4    Planning and installation of VR lab. NTNU (lead)

Task 2.5    Planning and upgrading of field laboratory. NTNU (lead)

Task 2.6    Planning and installation of new test rigs for dry drilling a fracturing. NTNU (lead)

Task 2.7    Planning and installation of new experimental equipment for stability surveying and strain        measurements in rocks . NTNU (lead)

Project facts

Project facts

Lead partner: NTNU

Contact person: Oddbjørn Bruland

Partners: NINA

 

NTNU – Norges teknisk-naturvitenskapelige universitet

  • For ansatte
  • |
  • For studenter
  • |
  • Innsida
  • |
  • Blackboard

Studere

  • Om studier
  • Studieprogram
  • Emner
  • Videreutdanning
  • Karriere

Aktuelt

  • Nyheter
  • Arrangement
  • Jobbe ved NTNU

Om NTNU

  • Om NTNU
  • Bibliotek
  • Strategi
  • Forskning
  • Satsingsområder
  • Innovasjon
  • Organisasjonskart
  • Utdanningskvalitet

Kontakt

  • Kontakt oss
  • Finn ansatte
  • Spør en ekspert
  • Pressekontakter
  • Kart

NTNU i tre byer

  • NTNU i Gjøvik
  • NTNU i Trondheim
  • NTNU i Ålesund

Om nettstedet

  • Bruk av informasjonskapsler
  • Tilgjengelighetserklæring
  • Personvern
  • Ansvarlig redaktør
Logg inn
NTNU logo